nRAH

  • Client: BOC, BSA, CDC Plumbing, Getinge, HYLC, Nilsen, Online Fire & Spotless
  • Skills: Service Coordination / Shop Drawings / As Constructed Drawings

About the Project

Opened in late 2017, the new Royal Adelaide Hospital is a 275,000m2 multi-storey building, consisting of 40 operating theatres and 800 beds, including 100 same day beds. It is estimated the hospital will treat more than 400,000 outpatients per year.

THE TASK
Drafting Solutions was engaged to provide a complete solution in Autodesk Revit for medical gas, pneumatic tube, dry fire and refrigeration systems. This included services coordination, shop drawings and as constructed drawings.

We also provided drafting services throughout the construction phase, relating to hydraulic services, mechanical services, antenna systems, department fit-outs, medical pendants, automatic guided vehicles, inventory management and signage.

THE CHALLENGE
The coordination process for this project was very challenging, with tight ceiling spaces and a complex reticulation of services throughout the building. The services coordination included in-ceiling services, reflected ceiling plans and wall elevations throughout the building.

THE SOLUTION
Drafting Solutions provided coordinate files to the site teams, allowing them to mark out penetrations, pipework and pipe hangers with surveyor’s equipment. This streamlined the set-out and installation of services, greatly reducing the man hours on site.

Since the start of the project, we have dedicated over 14,500 drafting hours, managed over 300 3-D model files and created approximately 700 detailed shop drawings.